Toolpool’s equipment was during spring 2003 used for the pick-up and relocation of a fibre optic cable for hook-up to the Kvitebjørn platform. The cable was trenched to a depth of 1 meter, requiring high tension during pick-up.

The installation solution included use of Moonpool Container 20, which gave safe installation of cable protection elements, Cable Guide 2500 and Cable Tension Unit 2000.