projects/..Mika/Nysted

During spring 2003 Mika installed electrical power cables between transformation station and each of 8 rows of windmills on Nysted Windmillpark. The installation was done in pre-made trenches, which required a high degree of accuracy.

The electrical power cable was loaded onboard and laid by Cable Tension Unit 800.