Print
projects/..Kristin

For the Kristin Marine, FO-cable installation, toolpool provided equipment and services for the loading, and the complete lay spread system for simultaneous laying and trenching.

The lay spread system was mobilised during 24 hours while the installation was done in 3 weeks.

The system consisted of two tensioning units in serie, each with a capacity of 3 tons, HPU's, workshop container, moonpool container and two winches for handling of the guideweight and for lay-down of the last cable end.